Insufficient quantity of materials: problem resolved at Complexe scolaire Mapendo thanks to citizen monitoring
At Complexe scolaire Mapendo (Tshangu, Kinshasa), the Integrity Club reported on EduCheck: insufficient quantity of materials. Within 43 days and through « Advocacy », the project fixed the problem; the monitors checked the fix on site.
The « Installation de panneaux solaires » project is meant to improve Complexe scolaire Mapendo (Tshangu, Kinshasa). Student monitors of the school’s Integrity Club, trained by the Anti-Corruption Research Centre (CERC), follow the works with the EduCheck questionnaire to check that what was promised is delivered.
The problem
On 5 January 2026, the Integrity Club reported the following problem at Complexe scolaire Mapendo: insufficient quantity of materials.
Materials that were paid for must reach the site: every diverted bag means a weaker building.
The problem was published on the school’s page and sent to the project management committee and the contractor.
The dialogue
The monitors opened a dialogue with the project management committee and the contractor:
- Advocacy
The result
The fix was recorded on 17 February 2026, 43 days after the report.
During their visit on 11 October 2026, the monitors checked the fix on site: the problem moved to « Verified » on EduCheck.
This success shows what citizen monitoring makes possible: a problem made visible, a dialogue with the right people and a verified solution, for the benefit of pupils.
Your school can change too
Students, parents and teachers trained by CERC monitor their school and talk with those in charge until problems are fixed.
More success stories
-
March 2026
Lessons given by unqualified teachers: problem resolved at École primaire Espoir thanks to citizen monitoring
-
March 2026
School timetable not displayed: problem resolved at Institut Furaha thanks to citizen monitoring
-
February 2026
Works stopped or delayed: problem resolved at Complexe scolaire Mapendo thanks to citizen monitoring