Accessibility (disability)
Will the completed project be accessible for people with disabilities?
Réhabilitation d’un bâtiment scolaire — École primaire Les Collines ·
Signalé lors de la visite de suivi du 29 décembre 2025.
Verified
Resolved through Advocacy
Status
Verified
287 daysSince the report
MoyenSeverity
CategoryAccessibility (disability)
History
-
Reported
-
Fixed
-
Preuve de correction
Correction constatée lors de la visite de suivi du 27 mars 2026.
-
Verified
How the problem was fixed
Les plans ont été modifiés et une rampe construite à l’entrée du bâtiment.
Case study
Building not accessible to people living with disabilities: problem resolved at École primaire Les Collines thanks to citizen monitoring
The Integrity Club reported on EduCheck: building not accessible to people living with disabilities. The problem was published and sent to the project management committee and the contractor.