Correction rate
Definition
Share of the problems found that have been fixed (fixed or verified), rejected reports excluded.
5Open problems
1Problems fixed
0/7documents obtained
How is the project doing?
1 Problems fixed · 6 Problems found
Problem
Are there any obvious signs of corruption in this project?
Integrity, illegal fees, corruption
View
Reported – 08/02/26
Resolved?
Problem
Are materials stored safely and appropriately, such that they do not degrade or cause harm and so that valuable items are not stolen?
Materials and bill of quantities
View
Reported – 11/12/25
Resolved?
Problem
Is all construction work being performed to the correct standard? For example, are foundations or toilet pits being dug to the correct depth?
Construction quality
View
Acknowledged – 08/02/26
Resolved?
Problem
Will the completed project be accessible for people with disabilities?
Accessibility (disability)
View
Acknowledged – 08/02/26
Resolved?
Latest updates
Monitoring sheet
Show answers as a table
| Question | Answer | Result |
|---|---|---|
| P01 — Have you received a full and accurate copy of the bill of quantities for this project? | Yes | Correct |
| P02 — Has a project management committee been established for this project? | Yes | Correct |
| P03 — Do most of the labourers on this project come from the local area? | No | Neutral |
| P04 — Have the labourers been supplied with the correct safety equipment? | Yes | Correct |
| P05 — Is the project using materials of the correct type and quality? | Yes | Correct |
| P06 — Does the project have the correct amount of materials? | Yes | Correct |
| P07 — Is all construction work being performed to the correct standard? For example, are foundations or toilet pits being dug to the correct depth? | No | Problem |
| P08 — Is the construction work causing any undue damage to the local environment? | No | Correct |
| P09 — Will the completed project be accessible for people with disabilities? | No | Problem |
| P10 — Is the project site appropriately fenced off, or otherwise made safe from the community? | Yes | Correct |
| P11 — Are materials stored safely and appropriately, such that they do not degrade or cause harm and so that valuable items are not stolen? | No | Problem |
| P12 — Are there any indications of materials being stolen, damaged or misused? | Yes | Problem |
| P13 — Are there any obvious signs of corruption in this project? | Yes | Problem |
| P14 — Has activity on this project been stopped or delayed for any reason not already mentioned? | No | Correct |
| P15 — Has the contractor or sub-contractor complained that they have not got enough money? | No | Correct |
| P16 — Have the labourers complained that they have not been correctly paid? | No | Correct |
| P17 — Is public information clearly visible on the project site to provide details about the project, including who to contact with queries? | Yes | Correct |
| P18 — How would you describe the project management committee's level of engagement and cooperation with monitoring activities? | Not very cooperative | Neutral |
| P19 — How would you describe the local community's level of engagement with this project? | Engaged | Neutral |
Problems found per visit
Access to information
0/7 documents obtained
| Document | Available |
|---|---|
| Contrat | not available |
| Budget | not available |
| Devis quantitatif | not available |
| Plans | not available |
| Rapport annuel | not available |
| Avenants / variations | not available |
| Évaluation | not available |
Community views Definition
Anonymous survey: results are published only from 5 answers.
Definition
Anonymous survey: results are published only from 5 answers.
Not enough answers yet (minimum 5).