Demonstration

Some of the schools, infrastructure projects, visits and problems shown are fictitious (EduCheck code DEMO-…); the figures shown include them.

Maintenance

Is the school's infrastructure well-maintained? For example, are the floors and grounds kept in good condition, and breakages repaired in a timely fashion?

Institut Tumaini Jipya ·

Reported during the monitoring visit of 7 November 2025.

Acknowledged
Status Acknowledged
0 daysSince the report
MediumSeverity
CategoryMaintenance

History

  1. Acknowledged

    · School

  2. Reported

    · Monitor

  3. Progress

    · Anonymous citizen

    Problem still observed on 4 February 2026.

  4. Progress

    · Anonymous citizen

    Problem still observed on 7 May 2026.

  5. Fixed (upcoming step)

  6. Verified (upcoming step)

Similar problems