Construction quality
Is all construction work being performed to the correct standard? For example, are foundations or toilet pits being dug to the correct depth?
Construction of 3 classrooms — École primaire Lumière ·
Reported during the monitoring visit of 3 January 2026.
Fixed
Resolved through Advocacy
Status
Fixed
0 daysSince the report
MediumSeverity
CategoryConstruction quality
History
-
Fixed
The substandard works were redone under an engineer’s supervision.
-
Reported
-
Proof of fix
Fix observed during the monitoring visit of 13 February 2026.
-
Verified (upcoming step)
How the problem was fixed
The substandard works were redone under an engineer’s supervision.
Case study
Works not built to standard: problem fixed at École primaire Lumière thanks to citizen monitoring
The Integrity Club reported on EduCheck: works not built to standard. The problem was published and sent to the project management committee and the contractor.