Demonstration

Some of the schools, infrastructure projects, visits and problems shown are fictitious (EduCheck code DEMO-…); the figures shown include them.

Construction quality

Is the project using materials of the correct type and quality?

Construction of a block of 8 latrines — Institut Tumaini Jipya ·

Reported during the monitoring visit of 9 December 2025.

Verified

Resolved through Advocacy

Status Verified
0 daysSince the report
MediumSeverity
CategoryConstruction quality

History

  1. Fixed

    · Monitor

  2. Verified

    · Monitor

  3. Reported

    · Monitor

  4. Proof of fix

    · Anonymous citizen

    Fix observed during the monitoring visit of 16 January 2026.

How the problem was fixed

The faulty materials were removed and replaced by materials matching the bill of quantities.

Case study

Poor quality materials: problem resolved at Institut Tumaini Jipya thanks to citizen monitoring

The Integrity Club reported on EduCheck: poor quality materials. The problem was published and sent to the project management committee and the contractor.

Read the case study

Similar problems