Demonstration

Some of the schools, infrastructure projects, visits and problems shown are fictitious (EduCheck code DEMO-…); the figures shown include them.

Accessibility (disability)

Will the completed project be accessible for people with disabilities?

Rehabilitation of a school building — Institut technique Le Progrès ·

Reported during the monitoring visit of 12 January 2026.

Fixed

Resolved through Advocacy

Status Fixed
0 daysSince the report
MediumSeverity
CategoryAccessibility (disability)

History

  1. Fixed

    · Monitor

    The plans were changed and a ramp built at the entrance of the building.

  2. Reported

    · Monitor

  3. Proof of fix

    · Anonymous citizen

    Fix observed during the monitoring visit of 13 February 2026.

  4. Verified (upcoming step)

How the problem was fixed

The plans were changed and a ramp built at the entrance of the building.

Case study

Building not accessible to people living with disabilities: problem fixed at Institut technique Le Progrès thanks to citizen monitoring

The Integrity Club reported on EduCheck: building not accessible to people living with disabilities. The problem was published and sent to the project management committee and the contractor.

Read the case study

Similar problems