Demonstration: some of the schools, infrastructure projects, visits and problems shown are fictitious (EduCheck code DEMO-…); the figures shown include them.

Materials and bill of quantities

Are materials stored safely and appropriately, such that they do not degrade or cause harm and so that valuable items are not stolen?

Construction d’un bloc de 8 latrines — Institut Mabele ·

Signalé lors de la visite de suivi du 10 novembre 2025.

Fixed

Resolved through Meeting with the school management

Status Fixed
336 daysSince the report
MoyenSeverity
CategoryMaterials and bill of quantities

History

  1. Reported

    · Monitor

  2. Fixed

    · Monitor

    Un magasin fermé a été construit et un registre des entrées et sorties tenu.

  3. Preuve de correction

    · Monitor

    Correction constatée lors de la visite de suivi du 26 janvier 2026.

  4. Verified (upcoming step)

How the problem was fixed

Un magasin fermé a été construit et un registre des entrées et sorties tenu.

Case study

Materials kept safe at Institut Mabele

At Institut Mabele, the Integrity Club reported cement stored in the rain and materials left unguarded. Result: a locked store was built and a register of stock in and out kept.

Read the case study

Similar problems