Materials and bill of quantities

Does the project have the correct amount of materials?

Installation of solar panels — Complexe scolaire Mapendo ·

Reported during the monitoring visit of 5 January 2026.

Verified

Resolved through Advocacy

Status Verified
0 daysSince the report
MediumSeverity
CategoryMaterials and bill of quantities

History

  1. Fixed

    · Monitor

  2. Verified

    · Monitor

  3. Reported

    · Monitor

  4. Proof of fix

    · Anonymous citizen

    Fix observed during the monitoring visit of 17 February 2026.

How the problem was fixed

The missing quantities were delivered and checked with the management committee.

Case study

Insufficient quantity of materials: problem resolved at Complexe scolaire Mapendo thanks to citizen monitoring

The Integrity Club reported on EduCheck: insufficient quantity of materials. The problem was published and sent to the project management committee and the contractor.

Read the case study