Materials and bill of quantities
Are materials stored safely and appropriately, such that they do not degrade or cause harm and so that valuable items are not stolen?
Construction of a block of 8 latrines — Institut Mabele ·
Reported during the monitoring visit of 10 November 2025.
Resolved through Meeting with the school management
History
-
Fixed
A locked store was built and a register of stock in and out kept.
-
Reported
-
Proof of fix
Fix observed during the monitoring visit of 26 January 2026.
-
Verified (upcoming step)
How the problem was fixed
A locked store was built and a register of stock in and out kept.
Case study
Materials badly stored: problem fixed at Institut Mabele thanks to citizen monitoring
The Integrity Club reported on EduCheck: materials badly stored. The problem was published and sent to the project management committee and the contractor.